Wednesday, July 23, 2008

23/07/08

Over the last 3 days we have covered a lot of stuff on roofing and have even built a small roof. I really liked building the small roof and thought that it was also done to a pretty good standard considering we are learning as we go. The part that i enjoyed most was the gable because i am still getting used to putting them together and thought it was good to see other ways of doing it. I thought it was good cutting a separate pair of rafters to go under the trimmers and before now i would have never though to do it that way now i think it is good and will be something for me to take back to work. Apart from that i liked doing the scotch valley because its not something you get a lot of and was good for jogging the memory.

During the practical there was also a lot of maths involved with a bit of problem solving for example, i needed to get a 40 and 50 degree angle and i thought it would be a challenge to do it without the protractor so i used the red roofing book. i managed to get the angles for a 40 degree cut but the book stopped at 45 and didn't have 50 so after a bit of thought i decided square a line of the the 40 degree mark and because the 2 angles have to equal 90 it made 50.

Friday, May 30, 2008

30/05/08

Today we spent all day ouside. In the morning we started off with work on our eaves and finished off pulling it all apart including the roof. I liked doing the eaves because i haven't had much experience doing this and it was sort of new to me. First off we started off setting out the boxed eaves. At first i didn't want to do it but once i got into it it was a lot easier than i thought. The most unusual part to me was cutting the notch out for the gutter to sit on but other than that it was all pretty similar.

the other type of eave we did was lined on the rake. this was deffinately a lot different to the eaves we do at work but still not really hard. the only part that i thought could really make things hard was the bottoms of the rafters. That is because all the rafters are a different width it is only a couple of mm and is allowed for with the birds mouth the only thing wrong with that is the way its done makes all the tops level. leaving the bottoms all over the place.

Wednesday, May 28, 2008

28/05/08

Yesterday we started our roof. We started off by setting up our scaffold and getting our joists on. We made sure the joists were couple with the already set out rafters. After all the joists were on we then cut a heap of trimmers. The trimmers are designed to go between the joists over the walls to lock the walls in and to provide support for the gyprock. Trimmers were also cut to go from the last joist to the wall plate this allows us to keep the joists back away from the hips and valleys. Once the trimmers were done we then measured in a hanger to go through the main room to support the joists. The hanger was nailed to an off cut of joist to get it at the right hieght then the joists were skew nailed to it. After the joists were all shot up we then used metal straps to strengthen the joist up more. the straps are made to be nailed to the joist and the hanger because skew nails wouldn't be strong enough to hold under wieght.

The next step after the cieling was to cut the rafters and we did that by using a bevel and the red roofing book to work out the lengths and cuts. First we started working out and cutting rafters for different angled pitches before cutting them all to suit a 25 degree pitch. Once a few commons were cut and one jack was done a few of us could start pitching while the rest cut more rafters. after there were enough rafters to hold the ridge up i jumped down and cut one of the hips using the red book to work out the length and angle of the cut. I had never used the red book to work out hip lengths before and was suprised by how close it was. Its a bit of a shame the rest didn't work out so well but we aren't finished yet.

Wednesday, May 21, 2008

21/05/08

Over the last few days we have been installing locks, hanging doors and skirting. So far i have hung the double doors installed the lock and done some skirting but i still have a single door to go. While installing the double doors i came across a few problems and had to try find ways to make things easier for myself without these ways i think it would if nearly been impossible. Installing the lock i thought was pretty easy but was easy to stuff up if your not paying attention or rush. I thought the hardest part was drilling out where the locking piece would sit because if it was on an angle then the door knob would sit off in the other hole and there would be a gap around. Skirting was tricky but with a bit of help from Paul it became easier but time comsuming. Overall i think i have done a pretty good job with these things but with more practise i could do better.

Friday, April 11, 2008

11/04/08

Over the past couple of days we have done quite a bit of work on our form work. We have gone from having all the string lines set up to getting the footings dug and the form work cut out and set up. There wasn't really a lot involved in getting this done but instead we just had to get stuck into it. While doing this i learned quite a bit and thanks to my group listening to paul we were able to make our form work really strong.

When we weren't doing the practical were in the class room doing the construction sequence and we also had a few assessments to get through as well. On wednesday we had a test on powder actuated tools, yesterday we had a test on wall framing and today we had 2 on cladding. In the powder actuated tools test i got 79 percent and i dont know how i did in the others.

Tuesday, April 8, 2008

08/04/08

Over the last 2 days we have been focusing on form work. To start with we went out the back of the Tafe where there is plenty of room and set up a boundary with a string line and used a fence as the second boundary. After that we decided which plan we were going to follow and put a stake in the ground a few metres from each boundary. We made that the back corner of the house. From that we came forward the overall distance of the house and came in the same distance from the boundary and put a stake. Once we had the 2 stakes it got tricky because the fence at the back wasn't straight so we had to get the 2 overall lengths and use pythagoras to find exactly where the other back corner would sit after that the last point was easy.

Once we had all four points we came back of each stake and put pegs in the ground for hurdles but before we put the cross pieces on we went 170mm up on the hieghest point and then used the level to get them all the same. As soon as the hurdles were up we went about marking exactly where the ouside walls would sit. At first i found it really easy but when we came back and made sure every thing was right we came into problems. We started changing things and in the end it turned out we were changing the wrong things but as soon as the back wall was squared up using pythagoras and everything was adjusted again it all worked out good.

Once the outside walls were done we started putting in more hurdles for the other walls and before long the outline was all stringed out. I felt that i was really switched on during this step but i dont think it would of made a difference if we didn't have pythagoras. i learned that pythagoras is the most accurate way to make a right angle and the bigger the triangle the more accurate still.

Thursday, February 21, 2008

22/02/08

Yesterday we spent most of the day working on our cladding. I was Working with Rhys and i thought that we did a good job. We got our pine boards on really quick i believe this is because we got our end stopps on really straight and didn't have to measure all the boards. i also thoght that we did a good job cladding around the window because its a little bit tricky. when we had put a few boards on i compared it to the last wall and even though i think the ceddar boards look good i thought the pine looked just as goo because we had taken the time to pre drill all the holes so there wasn't one crack.

Today we started off in the morning by doing a bit of work on powder actuated tools. I thought that this was easy but at the same time i learned a lot. After some smoko we actually got to go out and fire one of the guns. The gun we fired was an indirect one which means there is a piston between the catridge and the nail. I was the second person to fire it and after the book work i was a bit nervous. After i fired it i was a bit suprised, firstly because it put a nail into concrete and also because the gun was nowhere near as bad as i thought it was gonna be. After that we finished the day by completing the booklet on the powder actuated tools and then organised our portfolio for the wall framing.